About Project

Project Overview

Ram Van Gaman Path Private Limited. (“RVGPPL” or the “Company”) is a Special Purpose Vehicle (SPV), incorporated on March 03, 2023 for implementation of the Project “Construction of 4-Lane green field highway from km. 35.00 to 49.155 of NH -731A with paved shoulder on Hybrid Annuity Mode in the state of Uttar Pradesh”.

S&P Infrastructure Developers Private Limited (SPIDPL) controls 51% of the equity interest in RVGPPL and Sunny Infraproject Private Limited (SIPL), controls 49% of the equity interest in RVGPPL.

Total Length of Project i.e., 14.155 Km of NH-731A (Autarpur and Singraur). The LOA for the project was issued by Authority (MoRTH) on 17.01.2023 and Agreement was signed on 03.03.2023 and Appointed Date was declared on 30.10.2023.

Read More Read More

4

Lane

14.155 km

Project Length

4.696 Km

Service Road