S. No. | Item | Description |
---|---|---|
1 | Project Name | Construction of 4-Lane green field highway from km. 35.00 to 49.155 of NH -731A with paved shoulder on Hybrid Annuity Mode in the state of Uttar Pradesh. |
2 | NH No. (Old / New) | New NH -731A |
3 | Mode of the Execution | Hybrid Annuity Mode (HAM) |
4 | No. of Lanes/ Configuration | 4 Lane |
5 | Length of the Project (in Km) | 14.155 Km |
6 | No. of Major Bridges | 1 Nos |
7 | No. of Fly Over | 2 No. |
8 | No. of VUP | 6 No. |
9 | No. of Minor Bridges | 10 No. |
10 | No. of ROB | 1 No. |
11 | No. of Culvert | 26 No. |
12 | Concessionaire Name | Ram Van Gaman Path Private Limited. |
13 | EPC Contractor | S&P Infrastructure Developers Pvt. Ltd and Sunny Infraproject Pvt. Ltd. |
14 | Date of Award (LOA Date) | 17 January 2023 |
15 | Appointed Date | 30 October 2023 |
16 | Construction Period (in Days) | 730 Days |
17 | Authority Name | Ministry of Road Transport and Highways, NH PWD-Prayagraj, Uttar Pradesh |
18 | Independent Engineer | M/S L N Malviya Infra Project Private Limited. |
19 | Safety Consultant | S.E.S. (Specialized Engineering Services Pvt Ltd) |