| S. No. | Item | Description |
|---|---|---|
| 1 | Project Name | Construction of 4-Lane green field highway from km. 35.00 to 49.155 of NH -731A with paved shoulder on Hybrid Annuity Mode in the state of Uttar Pradesh. |
| 2 | NH No. (Old / New) | New NH -731A |
| 3 | Mode of the Execution | Hybrid Annuity Mode (HAM) |
| 4 | No. of Lanes/ Configuration | 4 Lane |
| 5 | Length of the Project (in Km) | 14.155 Km |
| 6 | No. of Major Bridges | 1 Nos |
| 7 | No. of Fly Over | 2 No. |
| 8 | No. of VUP | 6 No. |
| 9 | No. of Minor Bridges | 10 No. |
| 10 | No. of ROB | 1 No. |
| 11 | No. of Culvert | 26 No. |
| 12 | Concessionaire Name | Ram Van Gaman Path Private Limited. |
| 13 | EPC Contractor | S&P Infrastructure Developers Pvt. Ltd and Sunny Infraproject Pvt. Ltd. |
| 14 | Date of Award (LOA Date) | 17 January 2023 |
| 15 | Appointed Date | 30 October 2023 |
| 16 | Construction Period (in Days) | 730 Days |
| 17 | Authority Name | Ministry of Road Transport and Highways, NH PWD-Prayagraj, Uttar Pradesh |
| 18 | Independent Engineer | M/S L N Malviya Infra Project Private Limited. |
| 19 | Safety Consultant | S.E.S. (Specialized Engineering Services Pvt Ltd) |